serving 2013-08-04 through 2013-08-11
NOTICE TO CONTRACTORS Project: Mt. Jordan Middle School, 9360 S. 300 E., Sandy, UT 84047 Bid Package: Bid Package-01: Building Demolition CM/GC: Hogan & Associates Construction, Inc., 940 N 1250 W, Centerville UT 84014 801-951-7000 Phone 801-951-7100 Fax Plan Coordinator: Tracy Heun (theun@hoganconstruction.com) Estimator: Mark Jensen (mjensen@hoganconstruction.com) Owner: Canyon School District, 9150 S. 500 W., Sandy, UT 84070 Architect: MHTN Architects, 420 E South Temple, Salt Lake City, UT 84111 ALL CORRESPONDENCE or inquiries are to be directed to the Construction Manager (CM/GC). Bid Package-01 includes the demolition of the existing Mt. Jordan Middle School. Hazardous materials removal was taken care of separately by the school district. MANDATORY PRE-BID Meeting will held August 14, 2013 at 1:00 PM at the project site. Bids Due August 21, 2013, 2:00 PM prevailing Mountain Time at the office of the CM/GC. Project documents for this bid package will be available at the office of the construction manager on or about Wednesday, August 7, 2013. All bidders need to register with the CM in order to receive full documents and future addendum. Contact Tracy Heun @ 801-951-7000 or theun@hoganconstruction.com to make arrangements to receive bidding documents. Bid Bond. A bid bond or cashier's check is required in the amount of five percent (5%) of the bid amount. The Owner reserves the right to reject any or all bids or proposals or to waive any formality or technicality in any proposal in the best interests of the District. RFI's or clarifications must include proper backup i.e., clear description of question, page numbers, specification section, detail, etc. and be emailed to Mark Jensen, Estimator, mjensen@hoganconstruction.com. 896893 UPAXLP
NOTICE TO CONTRACTORS Project: Mt. Jordan Middle School, 9360 S. 300 E., Sandy, UT 84047 Bid Package: Bid Package-01: Building Demolition CM/GC: Hogan & Associates Construction, Inc., 940 N 1250 W, Centerville UT 84014 801-951-7000 Phone 801-951-7100 Fax Plan Coordinator: Tracy Heun (theun@hoganconstruction.com) Estimator: Mark Jensen (mjensen@hoganconstruction.com) Owner: Canyon School District, 9150 S. 500 W., Sandy, UT 84070 Architect: MHTN Architects, 420 E South Temple, Salt Lake City, UT 84111 ALL CORRESPONDENCE or inquiries are to be directed to the Construction Manager (CM/GC). Bid Package-01 includes the demolition of the existing Mt. Jordan Middle School. Hazardous materials removal was taken care of separately by the school district. MANDATORY PRE-BID Meeting will held August 14, 2013 at 1:00 PM at the project site. Bids Due August 21, 2013, 2:00 PM prevailing Mountain Time at the office of the CM/GC. Project documents for this bid package will be available at the office of the construction manager on or about Wednesday, August 7, 2013. All bidders need to register with the CM in order to receive full documents and future addendum. Contact Tracy Heun @ 801-951-7000 or theun@hoganconstruction.com to make arrangements to receive bidding documents. Bid Bond. A bid bond or cashier's check is required in the amount of five percent (5%) of the bid amount. The Owner reserves the right to reject any or all bids or proposals or to waive any formality or technicality in any proposal in the best interests of the District. RFI's or clarifications must include proper backup i.e., clear description of question, page numbers, specification section, detail, etc. and be emailed to Mark Jensen, Estimator, mjensen@hoganconstruction.com. 896893 UPAXLP